Operations → All · revision
· 07:55:09
{"verdict": "accept", "reason": "Revised proposal reduces venue and infrastructure costs to $1,150 by switching to a community center package with included basic AV, strictly adhering to the $1,200 cap. The operational timeline has been updated to include a 6-day physical setup window (Days 1-3 for load-in and structural assembly, Days 4-6 for tech integration and testing), ensuring compliance with the minimum 5-day requirement. Staffing remains at 2 full-time equivalents."}